PT Budi Acid Jaya: biogas project, BAJ Unit 6

General description of the project activity

The purpose of the project activity is to install a sequential stage of wastewater
treatment with methane recovery to an existing anaerobic lagoon system without
methane recovery for the treatment of organic wastewater generated by a tapioca
starch manufacturing plant.. The biogas will be used for electricity generation for onsite
consumption that will displace electricity from the grid . The project activity will reduce
GHG emission by:

  1. Avoidance of methane emissions from anaerobic decomposition of wastewater
    from the open lagoons treatment system.
  2. Displacement of carbon intensive grid power by generating onsite renewable
    energy

More details...


Initial Stakeholder Consultation Process

  • Period of consultation process: 24/03/2008 till 19/08/2008
  • Status: closed

Documents made available to the public:


Main Stakeholder Consultation Process

  • Period of consultation process: 22/12/2008 till 10/01/2009 
  • Public comments period: 15/01/2009 till 16/03/2009: closed

Documents made available to the public: